Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
space:building:roof [2026/01/01 19:25] – ↷ Links adapted because of a move operation sirocylspace:building:roof [2026/01/05 03:33] (current) – Blanking (incorporated into building) sirocyl
Line 1: Line 1:
-# Building Roof 
  
-The roof of the building is strictly off-limits, and no access is provided to the roof. **Do not attempt to access the roof.** 
- 
-/* TODO: Uncomment this when policy documents are finalized. 
-**Attempting to access the roof is a violation of our tenancy agreements, and will result in immediate and material violations of DMA policy, and potential Section 2.7 and/or Section 2.6 action.** 
-*/ 
- 
-We have requested, and been denied, either access to the roof, or professional placement of equipment upon the roof. 
- 
-We will not continue to press the matter with our landlord. 
- 
-[[space:nearby:highpoints|High-altitude access]] to nearby buildings and locations is being investigated for placement of radio, free-space optical and wireless network equipment.